      Your current location:Home>Solutions>Industry>Wastewater treatment

      Waste leachate

        

      Due to the above characteristics of waste leachate, the discharge standards are becoming more and more stringent. From July 1, 2011, all existing domestic waste landfills began to implement the water pollution emission concentration limits stipulated in the "Domestic Waste Landfill Pollution Control Standard" (GB16889-2008). With the implementation of this standard, it is difficult for the conventional treatment process to meet the discharge standard, and the MBR-based deep treatment process is being increasingly and widely used.



      垃圾滲濾液A waste incineration power plant in Hebei Province

      Treatment scale: 600 m3/d

      Commissioning time: July 2018

      Raw water type: waste leachate

      Operation mode: operation 8min +aeration 2min

      Treatment process: conditioning tank - anaerobic tank - nitrification & denitrification tank  - MBR tank - nanofiltration & reverse osmosis tank

      Use of produced water: Dischargeup to standard






      Some application cases in waste leachate

      Project name

      Project size

      Type of raw water

      Use of produced water

      Jiangmen Landfill

      150m3/d

      Waste leachate

      Discharge up to standard

      Anxi Landfill

      100m3/d

      Waste leachate

      Reuse

      A kitchen waste project of a new energy environmental protection limited company

      80m3/d

      Kitchen waste

      Discharge up to standard

      A waste leachate project in Handan

      240m3/d

      Waste incineration

      Discharge up to standard

      A waste leachate project in Tangshan

      240m3/d

      Waste leachate

      Discharge up to standard

      A waste leachate project in Changchun

      320m3/d

      Waste leachate

      Discharge up to standard

      A waste leachate treatment MBR project in Shandong

      200m3/d

      Waste leachate

      Discharge up to standard

      A landfill leachate project in Hanzhong

      100m3/d

      Waste leachate

      Discharge up to standard

      A domestic waste incineration power generation project in Heilongjiang Province

      240m3/d

      Waste incineration

      Discharge up to standard

      A MBR membrane and reverse osmosis renovation and installation procurement project of a leachate treatment station in Macheng

      120m3/d

      Waste leachate

      Discharge up to standard

      A waste leachate project for a waste incineration power plant in Xingtai

      600m3/d

      Waste incineration

      NF

      A waste incineration in Jilin (Phase II)

      240m3/d

      Waste incineration

      Discharge up to standard

      A kitchen waste resource utilization project in Anhui

      120t/h

      Kitchen waste

      Discharge up to standard

      A sanitary landfill project of domestic waste in Anhui

      100t/h

      Kitchen waste

      Discharge up to standard

      A domestic waste incineration power generation project in Anhui

      100t/h

      Waste incineration

      NF

      A kitchen waste treatment project in Wuhu, Anhui Province

      120t/h

      Kitchen waste

      Discharge up to standard


      To Become the Global

      Leading Water Problem Solver

      久久青草无码亚洲国产精品|久久99青草精品视频|一本色道久久亚洲狠狠躁|一本精品99久久精品77
      1. <strike id="qpdpl"><menu id="qpdpl"><samp id="qpdpl"></samp></menu></strike>
        <u id="qpdpl"><s id="qpdpl"></s></u>
      2. <u id="qpdpl"><progress id="qpdpl"></progress></u>

        <object id="qpdpl"><menu id="qpdpl"></menu></object>

        <big id="qpdpl"></big>

      3. <big id="qpdpl"><strong id="qpdpl"></strong></big>